Back to Services
Standards & Compliance

Quality Control

Every project closes with a rigorous QC process — ensuring what's built meets our internal standards, client expectations, and provincial requirements.

Our Commitment
Built Right.
Verified Every Time.

TDOT CIVIL mandates a dedicated safety spotter at all pits when drilling near underground utilities. No exceptions, no shortcuts.

01
🔍

Site Inspection

Mandatory final walkthrough with site inspector before project sign-off. All work verified against construction and safety standards.

02
📋

Infrastructure Verification

All ducts capped, tagged, and labelled. GLBs and flowerpots verified flush to grade. Cable connections visually inspected.

03
🧪

Proofing & Testing

Continuity checks, pressure testing up to 100 PSI for 2–5 minutes, and sponge/proofing ball tests confirm clear pathways.

📁
04

As-Built Submission

Final drawings in PDF and CAD. GPS coordinates for all flowerpots and GLBs. All deviations documented with redlines.


Mandatory Requirements
Safety Standards
  • Spotter stationed at pit during all drilling near gas, hydro, or telecom utilities
  • All utilities daylighted and positions verified before any drill shot begins
  • Signed locate package on-hand — reviewed by driller and locator prior to work
  • Enbridge/TSSA compliance — spotting distances and pit requirements strictly followed
  • Emergency action plan + JSA completed before crew mobilizes on site
  • Spill kits on all bore trucks. Drill fluid runoff & erosion plan in place

PPE & Communication

Hard hat, hi-vis vest, gloves, steel-toe — always
Communication devices between driller, locator & spotter
4 T-bar barriers securing all open pits — rebar prohibited
Approved Traffic Control Plan (TCP) per provincial regulations
🚫

Zero Tolerance — No drill shot without confirmed spotter in position and all locates reviewed, signed, and on-site.


Close-Out Process
6-Step QC Checklist

Every project close-out follows this sequence — no sign-off until all six steps are complete.

01

Site Inspection & Walkthrough

  • Final walkthrough with site inspector
  • Verify all work meets construction standards
  • Sign-off before project closes
02

Infrastructure Verification

  • All ducts capped, tagged, labelled
  • GLBs and flowerpots flush to grade
  • Cable connections visually inspected
03

Proofing & Testing

  • Continuity checks — air flow & pathway
  • 100 PSI pressure test held 2–5 min
  • Sponge & proofing ball tests completed
04

Restoration Compliance

  • Soft surfaces — topsoil, seed/sod per municipal req.
  • Hard cuts — asphalt or interlocking restoration
  • All signage and debris fully cleared
05

Documentation & As-Built

  • Final drawings in PDF and CAD formats
  • GPS coordinates for all flowerpots & GLBs
  • Deviations documented with redlines
06

Final Sign-Off

  • Contractor and client sign-off completed
  • Town/municipality sign-off where required
  • Material inventory reconciled & submitted

🚫
Zero Tolerance Policy

No drill shot commences without a confirmed spotter in position and all locates reviewed, signed, and on-site. Non-negotiable on every active site.